Mon Oct. 12: The Portfolio Navigation is Being Upgraded Today. . Things may look a little strange during the process.

8 


Senior Tree,
2006

Leland High School | San Jose, CA

Design: Bill Gould
General Contractor: CRW
Sub-Contractor: Don Rich Studios
Cable Weaving: Cable More
Leaf Fabrication & Installation: Lizard Skin Studios
 
Description: This shade structure completes the stage in the middle of Leland High School’s quad.
The shade structure has woven cable within the steel frame, aluminum oak leaves are hung from the intersections of cable to provide interest, reflection, shade and reference the oak tree, a previous
senior gift, that once stood where the stage is now.

Contact us »